About Glenn Angeles

  • Identity Documents

  • Site Cards - If Applicable

  • UTR Documentation - If Applicable

Education

  • 1993-1995
    Bataan Heroes Memorial College Philippines

    College Graduate

    Certificate Marine Transportation

Experience

  • 2020 - Present
    Hargreaves

    Advanced Pipe fitter

    Hargreaves July 2020 - Present Advanced Pipefitter Air Liquide  Fabricates new tubing connecting from the pipes and mechanical machineries.  Reads drawing / sketch and general plan prior for the fabrication of new pipe sections. Employs trade method of geometry and trigonometry for patterns or lay-out making.  Sets up and operates various machines/ equipments. Uses variety of hand tools.  Performs line checking and punch listing prior for the hydro testing, air testing, flushing, or commissioning of the piping system.  Witness hydro testing and air testing of the piping system to be presented to the client for approval.  Submitting fully detailed job description.  Prepare and follow up work request to the other trades in tracking the pending work request and ensuring of a consistent logging in and out of the work request traceability system, highlighting the critical for completion.

  • 2020 - 2020
    Boccard Uk Ltd

    Advanced Pipe fitter

    Boccard UK Ltd. March 2020 – June 2020 Advanced Pipefitter Hinkley Point C  Able to work on isometric drawings.  Able to work on arrangement drawing.  Experience / Knowledge of works and site.  Fabrication shop ability (Pipework).  Fabrication shop ability (General).  Installing stainless steel pipe 8” nb and pipe support on site.  Fit up reinforcing pad inside the sumps.  Fabricate stainless steel pipe from 4” nb to 8” nb.  Monitoring day to day activity and own quality levels.  Complying with all relevant procedures and deliver high standards of safety performance during all operations.  Responding promptly and effectively to changing circumstances, planning for contingencies and managing conflicting priorities.  Ensuring safety plans, method statements and risk assessments are respected.  High attention to detail involving method statements and risk assessments.  Working in confined spaces.  Following regulatory health and safety processes and procedures.  Attaining quality standards in line with client expectations.

  • 2019 - 2020
    Doosan Babcock

    Advanced Pipe fitter

    Doosan Babcock February 2019 – January 2020 Advanced Pipefitter, Pipe Fabricator Projects to include: Heysham I, Hinkley Point B, Sizewell B, Wilton Petrochem, Fawley Refinery, FEP- Fife Ethylene Plant,  Repair and maintenance of all aspects of pipework on site – outages.  Boiler wall tube panel installation.  Valve replacement flanged / butt weld.  Tangent wall tube installation.  Large bore pipework and installation on-site machining pipe.  Tube manipulation.  Bending maintenance of site plant.  Operates clamp shell machine for cold cutting, preps and match bore of thicker pipes.  Tools machine shop, working steam tracing and flange joints.  S.Bore line work fabrication  Installing 12\nb valve replacement-flanged.  Butt weld superheater header replacement and drum inspection.  Refurbishing.  Working with Trainees.  High attention to detail involving method statements and risk assessments.  Working in confined spaces.  Following regularatory health and safety processes and procedures.  Attaining quality standards in line with client expectations.  General good housekeeping to ensure a safe and clean working environment.  Following risk/COSHH assessments, method statements and permits.

  • 2018 - 2019
    Boccard Uk Ltd

    Advanced Pipe fitter

    Boccard UK Ltd. July 2018 – January 2019 Advanced Pipefitter Hinkley Point C  Able to work on isometric drawings.  Able to work on arrangement drawing.  Experience / Knowledge of works and site.  Fabrication shop ability (Pipework).  Fabrication shop ability (General).  Installing stainless steel pipe 8” nb and pipe support on site.  Fit up reinforcing pad inside the sumps.  Fabricate stainless steel pipe from 4” nb to 8” nb.  Monitoring day to day activity and own quality levels.  Complying with all relevant procedures and deliver high standards of safety performance during all operations.  Responding promptly and effectively to changing circumstances, planning for contingencies and managing conflicting priorities.  Ensuring safety plans, method statements and risk assessments are respected.  High attention to detail involving method statements and risk assessments.  Working in confined spaces.  Following regulatory health and safety processes and procedures.  Attaining quality standards in line with client expectations.

  • 2012 - 2018
    Doosan Babcock

    Advanced Pipe fitter, Pipe Fabricator, Pipe Machinist

    Doosan Babcock April 2012 – June 2018 Advanced Pipefitter, Pipe Fabricator, Pipe Machinist Projects to include: Heysham II, Hinkley Point B, Tipton Welding, Tipton Training, Tipton Injectaseal, West Burton, Staythorpe, Ratcliffe, Longannet, Grangemouth FCCU  Repair and maintenance of all aspects of pipework on site – outages.  Boiler wall tube panel installation.  Valve replacement flanged / butt weld.  Tangent wall tube installation.  Large bore pipework and installation on-site machining pipe.  Tube manipulation.  Bending maintenance of site plant.  Operates clamp shell machine for cold cutting, preps and match bore of thicker pipes.  Tools machine shop, working steam tracing and flange joints.  S.Bore line work fabrication  Installing 12\nb valve replacement-flanged.  Butt weld superheater header replacement and drum inspection.  Refurbishing.  Working with Trainees.  High attention to detail involving method statements and risk assessments.  Working in confined spaces.  Following regularatory health and safety processes and procedures.  Attaining quality standards in line with client expectations.  General good housekeeping to ensure a safe and clean working environment.  Following risk/COSHH assessments, method statements and permits.

  • 2009 - 2011
    Servicio Filipino INC. Phillipines

    Pipe fitter

    Servicio Filipino INC. Philippines 2009 – 2011 Pipefitter  Fabricates new tubing connecting from the pipes and mechanical machineries.  Reads drawing / sketch and general plan prior for the fabrication of new pipe sections.  Employs trade method of geometry and trigonometry for patters or lay-out making.  Sets up and operates various machines / equipments. Uses variety of tools.  Performs line checking and push listing prior for the hydro testing, air testing, flushing or commissioning of the piping system  Submitting fully detailed job description.  Prepare and follow up work request to the other trades in tracking the pending work request and ensuring of a consistent logging in and out of the work request traceability system, highlighting the critical for completion.

  • 2008 - 2009
    Doosan Babcock

    Advanced Pipe fitter, Pipe Fabricator

    Doosan Babcock 2008 - 2009 Advanced Pipefitter, Pipe Fabricator Projects to include: Hinkley Point B, Dungeness B, Littlebrook PS, Tipton  Interpretation of isometric and orthogonal engineering drawings.  Fabrication of pipe-work and assembly of ferritic, stainless, nickel or aluminum alloy pipe, fabricated fittings, forged fittings, valves.  The bending manipulation preparation for welding, alignment, machining and checking of concentricity.  Development of non-standard fittings.  Cleaning of pipe bores and purging of pipe-work prior to welding.  Hydraulic and pneumatic pressure testing of assembled pipe-work.  Validation of quality records to ensure traceability of materials and compliance with engineering drawings.  Manual handling and use of lifting equipment.  Use of powered and unpowered hand tools and rotating preparation tools, reinstatement of equipment, work area to safe conditions.  Flange jointing and bolt tensioning / torque setting of bolts.